Yes. STR Select checked 23 Pocono municipalities across 3 counties and found a registration or zoning permit required in 20 of them, an inspection in 19, and no registration ordinance in 2. Rules are set township by township, so the answer depends on the municipality your property sits in. Checked 2026-09-28.

The permit is local. This guide lists what each of the 23 municipalities requires, what it costs where the number is printed, when it renews, and which tax lines apply on top.

The short answer

Yes, in most Pocono townships. 19 of 23 municipalities require a registration, 1 requires a zoning permit and 19 state an inspection requirement. 2 showed no registration ordinance and 1 could not be confirmed. By county, the registration counts are Monroe County (12 of 15), Carbon County (2 of 2), Pike County (5 of 6).

The permit comes from the borough or township, not the county or the state. The state and counties collect tax. The sections below give the municipality table, the fee range, the tax lines and the questions worth asking before you list.

Which Pocono municipalities require a short term rental permit

One row per municipality, each from the township’s own ordinance, fee schedule or page, with the record’s own checked date. Fees marked as set by resolution are not printed in the documents we found.

MunicipalityCountyPermitFeeRenewalInspectionSourceChecked
Stroudsburg Monroe Registration required $250 initial per unit (includes first inspection), $150 annual renewal, $100 per additional inspection annual, due May 1 yes Source 2026-09-14
East Stroudsburg Monroe Registration required Set by Borough Council resolution, amount not in the ordinance annual yes, annual Source 2026-09-14
Stroud Township Monroe Registration required Set by Board of Supervisors resolution, amount not in the ordinance annual yes, including sewage system inspection Source 2026-09-14
Pocono Township (Tannersville) Monroe Registration required Set in township fee schedule, amount not in the ordinance annual, November 1 to October 31 yes Source 2026-09-14
Mount Pocono Monroe Registration required $500 registration fee (application form) annual yes, before first rental and before renewal Source 2026-09-14
Coolbaugh Township Monroe Registration required $200 initial application, $150 annual renewal, $40 re-inspection annual; late fee doubles after Feb 15, license void after May 1 yes Source 2026-09-14
Tobyhanna Township Monroe Registration required Set by Board resolution, amount not in the sources we checked; $200 fee for application reviews beyond the third annual, rolling yes Source 2026-09-14
Tunkhannock Township Monroe Registration required $750 new permit, $250 renewal (effective March 1, 2026) annual yes Source 2026-09-14
Jackson Township Monroe Registration required $1,000 initial (non refundable), $750 annual renewal; $100 per extra inspection annual yes, every 2 years at renewal (confirmed: due in 2026 if not inspected in 2025) Source 2026-09-28
Middle Smithfield Township Monroe Registration required $500 annual (2026 fee schedule, Resolution 01-2026-4) annual, November 1 to October 31 yes Source 2026-09-14
Smithfield Township Monroe No registration ordinance found none found none found none found Source 2026-09-14
Hamilton Township Monroe No registration ordinance found none found none found none found Source 2026-09-14
Barrett Township Monroe Registration required Conflicting township documents: fee schedule (rev 03/26/2025) says $500 registration and $300 annual renewal; the (see source) annual yes, first inspection included; $100 re-inspection Source 2026-09-28
Paradise Township Monroe Registration required Set by resolution, amount not in the sources we checked annual yes Source 2026-09-28
Price Township Monroe Not confirmed not found not found not found Source 2026-09-14
Kidder Township (Lake Harmony) Carbon Registration required Set by resolution, amount not in the sources we checked annual yes Source 2026-09-14
Penn Forest Township (Albrightsville) Carbon Registration required Base license fee set by resolution, not published; $150 one time zoning permit application; annual inspection $100 (see source) annual yes, annual Source 2026-09-14
Lehman Township Pike Registration required Set by resolution, amount not in the sources we checked every two years yes, annual certified inspection report with application Source 2026-09-14
Dingman Township Pike Zoning permit required Set by fee schedule, amount not in the sources we checked not found not found Source 2026-09-14
Delaware Township Pike Registration required Set by resolution, amount not in the sources we checked annual yes Source 2026-09-14
Blooming Grove Township Pike Registration required Set by resolution, amount not in the sources we checked annual yes Source 2026-09-14
Palmyra Township Pike Registration required Set by resolution, amount not in the sources we checked; late renewal after Feb 15 doubles the fee annual yes, conditional Source 2026-09-14
Lackawaxen Township Pike Registration required $100 initial for existing compliant rentals, $300 for new; $50 annual renewal; $75 re-inspection annual yes Source 2026-09-14

Full fields for each row, including ordinance numbers, zoning districts and occupancy rules, are on the Poconos registration data page. The township by township write up is in 23 Pocono townships compared. The Poconos quarterly report counts 20 of 23 municipalities as requiring some form of registration or permit and sets that beside the market’s manager, fee and review counts.

What does a Poconos short term rental permit cost

10 of 23 municipalities print a dollar amount in the documents we found. Among those, Lackawaxen Township is lowest at $100 and Jackson Township is highest at $1,000 for the first fee listed in its record.

MunicipalityPrinted feeRenewal
Stroudsburg$250 initial per unit (includes first inspection), $150 annual renewal, $100 per additional inspectionannual, due May 1
Mount Pocono$500 registration fee (application form)annual
Coolbaugh Township$200 initial application, $150 annual renewal, $40 re-inspectionannual; late fee doubles after Feb 15, license void after May 1
Tobyhanna TownshipSet by Board resolution, amount not in the sources we checked; $200 fee for application reviews beyond the thirdannual, rolling
Tunkhannock Township$750 new permit, $250 renewal (effective March 1, 2026)annual
Jackson Township$1,000 initial (non refundable), $750 annual renewal; $100 per extra inspectionannual
Middle Smithfield Township$500 annual (2026 fee schedule, Resolution 01-2026-4)annual, November 1 to October 31
Barrett TownshipConflicting township documents: fee schedule (rev 03/26/2025) says $500 registration and $300 annual renewal; the (see source)annual
Penn Forest Township (Albrightsville)Base license fee set by resolution, not published; $150 one time zoning permit application; annual inspection $100 (see source)annual
Lackawaxen Township$100 initial for existing compliant rentals, $300 for new; $50 annual renewal; $75 re-inspectionannual

9 registration townships set the fee by resolution or fee schedule: East Stroudsburg, Stroud Township, Pocono Township (Tannersville), Paradise Township, Kidder Township (Lake Harmony), Lehman Township, Delaware Township, Blooming Grove Township, Palmyra Township. Call the township office for the current amount before you budget the first year, and ask whether the renewal fee matches the initial one.

What taxes apply to a Poconos short term rental

Tax is separate from the permit. Register for it in addition to the township permit.

LevelRateWhat it applies toSource
Pennsylvania6%Pennsylvania hotel occupancy tax on stays under 30 consecutive days, including Airbnb and Vrbo bookingspa.gov
Monroe County3%Hotel room rental excise taxCounty treasurer
Pike County3%Hotel room rental excise taxCounty treasurer
Carbon County3%Room rental excise tax, stays under 30 daysCounty treasurer

Rates are quoted from the pages listed in Sources. Confirm the current rate with the county treasurer before you file, because a collection rule can change between our checked date and your filing date.

Do lake communities and HOAs add their own rules

2 of the 4 communities we checked publish a rental rule. A community rule is separate from the township permit, so a home inside one needs both.

What should you ask the township before you list

Every question below comes from a field the township documents left open for a specific municipality.

  1. What is the current registration and renewal fee? The documents we found for East Stroudsburg, Stroud Township, Pocono Township (Tannersville), Paradise Township, Kidder Township (Lake Harmony), Lehman Township, Delaware Township, Blooming Grove Township, Palmyra Township set the amount by resolution or fee schedule and print no figure, so the township office is the only source for it.
  2. Stroudsburg: Local contact rule not confirmed from primary text. Confirm the current position with the township before you rely on this row.
  3. Pocono Township (Tannersville): Source is an archived copy of eCode360. Confirm the current position with the township before you rely on this row.
  4. Mount Pocono: Fee is from the 2022 application form. Confirm the current position with the township before you rely on this row.
  5. Tunkhannock Township: Third party sites still show an outdated $500/$100 fee. Confirm the current position with the township before you rely on this row.
  6. Jackson Township: Ordinance number and occupancy rule still not published on the township's own STR page as of 2026-09-28 recheck. Confirm the current position with the township before you rely on this row.
  7. Smithfield Township: Blog claims of an annual permit likely confuse it with Middle Smithfield. Confirm the current position with the township before you rely on this row.

Permit questions Pocono owners ask

Answered from each township’s own documents, not from forums.

Do I need a permit for a short term rental in the Poconos?

Almost always. In the 23 municipalities STR Select tracks, 19 require a registration, 1 requires a zoning permit (Dingman Township), 2 have no registration ordinance we could find (Smithfield Township, Hamilton Township) and 1 is not confirmed (Price Township). The rule is local, so the permit comes from the township or borough where the home sits, not from the county or the state.

Is there a statewide short term rental license in Pennsylvania?

The dataset behind this guide records no statewide permit. The state requirement we track is tax: Pennsylvania charges 6% pennsylvania hotel occupancy tax on stays under 30 consecutive days, including airbnb and vrbo bookings, per pa.gov. Whether a property needs a permit is decided by the municipality, as the table above shows.

How much does a short term rental permit cost in the Poconos?

Where a township prints a number, initial fees run from $100 (Lackawaxen Township) to $1,000 (Jackson Township). 9 of the 19 registration townships set the fee by resolution or fee schedule without printing an amount in the documents we found, so the amount has to be confirmed with the township office.

Do I need an inspection before I can rent?

19 of 23 municipalities in our dataset state an inspection requirement. Some inspect before the first rental and again at each renewal, Jackson Township inspects every 2 years at renewal, and Stroud Township includes a sewage system inspection. Treat the inspection as a lead time item and book it before you list.

How often do I renew?

Most registration townships renew annually, with different calendars: Stroudsburg is due May 1, Pocono Township and Middle Smithfield run November 1 to October 31, and Lehman Township renews every two years. Coolbaugh Township doubles the fee after February 15 for late renewals, and Palmyra Township applies the same late rule.

What taxes apply to a Poconos short term rental?

Pennsylvania charges 6% on stays under 30 consecutive days, including Airbnb and Vrbo bookings. Monroe County adds 3%, Pike County adds 3%, Carbon County adds 3%. Each rate is quoted from the county treasurer or the state revenue page listed under Sources.

Does my HOA or lake community have its own rental rules?

Often. Lake Naomi Club / Timber Trails: Rental property registration form and $150 annual registration fee (2026 policy); guest acknowledgment due within 72 hours of arrival; Arrowhead Lake: STR rental registration form and pre-registered guest check-in by QR code. A community rule sits on top of the township registration, so check both.

What if my township has no short term rental ordinance?

Smithfield Township, Hamilton Township showed no registration ordinance in the records we checked, and Price Township could not be confirmed. That does not mean the activity is unregulated: zoning rules, county taxes and the state hotel occupancy tax can still apply, and the Hamilton Township zoning board case in the sources shows a short term rental dispute can turn on zoning alone.

Does it matter which county the property is in?

It matters for tax and for which office you call. Registration counts by county in our data: Monroe County (12 of 15), Carbon County (2 of 2), Pike County (5 of 6). County hotel room excise tax is 3% in Monroe, 3% in Pike, 3% in Carbon.

Where can I see every township side by side?

The full registration dataset, with ordinance numbers, zoning, occupancy and local contact fields for each municipality, is on the Poconos registration data page, and the township by township write up is in the registration comparison post linked below.

Sources

Every row above traces to one of these pages, checked on the date shown in the table. Several come from township hosted ordinance PDFs or archived copies because eCode360 blocks automated access.